[Im4ca-wp1.beta] Deliverable D1.1- Readiness Report on Sensor Fleet

Rana Kanaan rana.kanaan at lsce.ipsl.fr
Fri Nov 21 11:29:00 CET 2025



Dear WP1 members, 




This is a reminder to fill in the [.... placeholders....] in the D1.1 draft that are related to your methane measurement activities in WP1 of IM 4 CA by 24 th of Nov at the latest. 



I highlight here the remaining [....placeholder....] sections that are still awaiting input from the concerned teams and the respective technology implementers: 



-The description of AGH Drone system that will be used in the controlled release experiment in Cyprus (page 16) 

-The description of INCAS Drone system that will be used in the controlled release experiment in Cyprus (page 16) 

-The principle of Aircraft-based methane measurement (page 12) 

-The principle of Fixed ground-based methane measurement (page 12) 



The D1.1 draft was sent to you on the 18 th of Nov. Please, use it and return it to me. 



Thank you, 

Rana 
--- 
Rana Kanaan 
[ https://www.lsce.ipsl.fr/ | Laboratoire des Sciences du Climat et de l’Environnement ] 
CEA Saclay, Orme des Merisiers, 91191 Gif sur Yvette, France 



De: "Rana Kanaan" <rana.kanaan at lsce.ipsl.fr> 
À: "im4ca-wp1 beta" <im4ca-wp1.beta at listserver.vu.nl> 
Cc: "Jean-Daniel Paris" <jean-daniel.paris at lsce.ipsl.fr> 
Envoyé: Mardi 18 Novembre 2025 10:40:52 
Objet: IM4CA Deliverable D1.1- Contribution call 


Dear WP1 members, 

We would like to ask each team performing measurements to contribute to D1.1, " Readiness Report on Sensor Fleet. ". The internal deadline for deliverable submission is December 1 st . 

The deliverable has a focus on car-based and UAV-based measurements. UU and CYI respectively have accepted to provide a first example of how the technique's description could look like. Previous experiment in TADI will serve as the basis for car-based techniques harmonisation, whereas the upcoming CYI campaign will be used for UAV measurements. The results of the latter will be added to the document at a later stage. 

Besides, we would like to take this opportunity to describe as well all measurements planned in WP1 - there are placeholders for aircraft and total column meausrments 

All teams: Could you please complete this draft with your contribution, blank areas […..] in particular, by 24 November at the latest? 

We would like to remind you that this deliverable is for public use, so if applicable for you please consider the confidentiality of your input. 

If any comment on the general outline, don’t hesitate to return to me. 
Thank you in advance for your valuable input. 

Best regards, 
Rana 
--- 
Rana Kanaan 
[ https://www.lsce.ipsl.fr/ | Laboratoire des Sciences du Climat et de l’Environnement ] 
CEA Saclay, Orme des Merisiers, 91191 Gif sur Yvette, France 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://listserver.vu.nl/pipermail/im4ca-wp1.beta/attachments/20251121/6ff1fece/attachment-0001.html>


More information about the Im4ca-wp1.beta mailing list